GORE HILL – Sydney - Australia
 
 
Location

The site is located at Gore Hill in Sydney and the data centre is under construction with a completion date expected 4th Qter 2011. The data centre is appropriately set back from the Pacific Highway towards the rear of the 5 hectare site. The Gore Hill location is 6km from the city CBD and provides an ideal position to support active / active computer systems between Gore Hill and the CBD based production systems of the tenant.

Description

The data centre is a 3 ½ level building providing an overall building area of 11,273 sqm. The building provides a half floor of office, 2 floors of data halls and associated plant and equipment areas. The two data hall floor levels each provide a floor plate size of approx 3100sqm and approx 2000sqm of computer placement area. The initial design of the facility was based on TRE’s DC 4000 design.

Specification

S/No Service Designation Specification/ Proposal
1 Building Data centre floor space 2000-3000m2 contiguous floor space seperated into 3 distinct rooms
2 Building Structure floor loading 12kPA
3 Building Clear ceiling height 4.0M
4 Utility Supply Incoming HV feeds Dual redundant source A+B (2N)
5 Utility Supply Transformers 2N
6 Electrical Emergency power generator 2N
7 Electrical UPS system configuration 2N
8 Electrical UPS battery autonomy 15 minutes autonomy at load
9 Electrical Final circuits to cabinets 2N (32A circuits) including branch circuit monitoring
10 Electrical DC power system 2N (2000A, -48V) 4hrs of autonomy at full load
11 Electrical Cabinet requirements 500-600 cabinets (600x1200x2200)
12 Electrical Power capacity for cabinets 4.5 kVA average (Maximum of 12 kVA)
13 Mechanical Cooling (CRAC) units N+1 unit redundancy
14 Mechanical Heat rejection (Chiller) units N+1 unit redundancy
15 Mechanical Cooling reticulation Ring perimeter served from dual risers. No single point of failure.
16 Mechanical Fluid leak detection To all Colocate cabinet areas along pipe work routes
17 Fire Protection Alarm and detection Convential and VESDA
18 Fire Protection Suppression Pre-action sprinkler (offices). Gas suppression (cabinet area).
19 Security Intruder detection CCure 800+ system (Chubb) to comply with local regulations
20 Security CCTV All entrances and exits, all cabinet aisles, external areas.
21 Security Access control All entrances and exits
22 BMS/ FM Building management system Monitoring and control of all E&M services
23 Telecom Telecom riser Dual access and dual risers for major local carriers

Artist Impression

Canberra Technology City


Under Construction

Canberra Technology City

Data centre under construction. Date 19th July 2011.